Monitoring

Monitoring activities are consistent with licensing, regulatory approvals and requirements set out in the Wuskwatim PDA.  Monitoring began even before construction to establish baseline conditions for use in measuring potential construction and operations impacts. 

During construction, which involved disturbances to land and water in the vicinity of the generating station, rigorous monitoring was conducted on all phases of the project (access road construction, site preparation and dam construction) and is continuing now that the station is operating.  Monitoring requirements include impacts such as: environmental (aquatic, terrestrial), heritage/archaeological, economic (employment, income, purchasing) and social impacts on residents and communities.

WPLP publishes annual Monitoring Overview reports, which can be downloaded by clicking here to link to the reports page.

Wholesale bags luggage outlet online celine cheap louis vuitton for women The best christian louboutin shoes women outlet replica Handbags men louis vuitton replica outlet authentic prada saffiano mini bag pink hermes replica clutch Handbags bags replica online louis vuitton wholesale fake hermes cufflinks Prada outlet online authentic bags belt Cheap outlet replica bags handbags louis vuitton harga hermes kelly original fake yves saint laurent wallet The best women crossbody purses replica online yves saint laurent celine purse replica christian louboutin replica Prada Italia Online Best shoes sandals christian louboutin outlet online